Skip to content
> GUIDANCE ......... OK
> TELEMETRY ........ OK
> PROPULSION ....... OK
T-03
APOGEE
00 — MISSION PROFILE

Our mission profile

Seven stages from brief to orbit. Each one ends with a go / no-go call, so you always know where the project is and what happens next.

01 — STAGES

The seven stages

  1. T-0 · 1 wk

    Pre-flight

    Discovery and goals. We define what success looks like before anyone opens Figma.

    One week of interviews, analytics review and competitor teardown. We agree the business goal, the audience and the numbers we will be judged on. You leave with a written mission brief, a fixed scope and a budget that does not move without a conversation.

    Output

    • Mission brief
    • KPIs
    • Scope & budget
  2. T-1

    Blueprint

    Sitemap, UX flows and wireframes. Structure first, decoration later.

    We map every page, every product path and every form. Wireframes are tested against real content, not lorem ipsum, so the structure survives contact with your copy. Sign-off here locks the architecture for design.

    Output

    • Sitemap
    • User flows
    • Wireframes
  3. T-2

    Design

    Art direction and motion prototypes. You see it move before we build it.

    Art direction, type, colour and a component system built for your brand. Key interactions are prototyped in motion, so you approve how the site feels, not just how a static frame looks. Two structured review rounds are included.

    Output

    • Art direction
    • UI design
    • Motion prototypes
  4. T-3

    Build

    Engineering, CMS and integrations. Clean code your team can actually edit.

    We engineer the front end, wire up the CMS or commerce platform and connect your tools: payments, CRM, email, ERP. You get a staging link from week one of the build and see progress in weekly demos, not a big reveal.

    Output

    • Production code
    • CMS
    • Integrations
  5. T-4

    Test

    QA on 20+ devices, plus performance and accessibility audits.

    Every template is checked on more than 20 real devices and browsers. We audit Core Web Vitals and accessibility against WCAG 2.2 AA and fix what we find before launch, not in a phase-two backlog.

    Output

    • QA report
    • Lighthouse audit
    • WCAG 2.2 AA check
  6. T-5

    Launch

    Deploy, redirects, analytics and Search Console. Zero-drama go-live.

    We run a launch checklist: DNS, SSL, redirect mapping from your old URLs, analytics events and Search Console verification. Go-live happens on a quiet weekday morning, with us on comms the whole time.

    Output

    • Deployment
    • 301 redirect map
    • Analytics & Search Console
  7. T-6

    Orbit

    30 days of hypercare, then an optional retainer. We stay on the line.

    For 30 days after launch we fix anything that misbehaves, at no charge, and train your team to run the site. After that you can keep us on a retainer for improvements and new features, or fly solo with full documentation.

    Output

    • 30-day hypercare
    • Training
    • Optional retainer
02 — PRE-FLIGHT CHECKLIST

What we need from you

  • 01One decision-maker who can sign off each stage
  • 02Access to analytics, domain registrar and current hosting
  • 03Brand assets: logo files, fonts and any guidelines
  • 04Content owner for copy, or a brief if we're writing it
  • 05Product data and photography (for stores)
  • 06Logins for tools to integrate: payments, CRM, email, ERP
  • 07A 45-minute review slot each week
03 — QUESTIONS

Process questions

Comms